Complete bathroom renovation for a pre-war apartment in the Upper West Side. The space was fully gutted, reconfigured for better flow, and finished with premium moisture-resistant paint and modern fixtures.
The existing bathroom had significant water damage behind the walls and outdated galvanized plumbing that needed complete replacement. Working within a co-op building required careful scheduling and material deliveries.
We gutted the entire bathroom down to the studs, replaced all plumbing with modern PEX piping, installed a new waterproof membrane system, and applied two coats of premium moisture-resistant paint. The new layout maximized the 5x8 footprint with a walk-in shower and floating vanity.
A bright, spa-like retreat that increased the apartment's value. The client reported zero moisture issues after the first year, and the paint finish remained flawless despite daily steam exposure.